A How we work Eight stages

You will always know where your project stands.

An architectural commission is split into eight regulated stages. For each one, here is what gets produced, what you approve, and how long it actually takes with us — not the theoretical figure.

A written progress note reaches you every fortnight during design, and every week once on site.

B The eight stages Full services
11

Needs assessment

Needs assessment: brief, site constraints, budget envelope, schedule. We write down what the client is actually after, before drawing anything.

Observed duration: 1 to 3 weeks
21

Feasibility study

Feasibility study: survey, condition report on the existing building, development capacity under the municipal zoning plan, two options tested in 3D and costed.

Observed duration: 2 to 5 weeks
31

Preliminary design

Preliminary design: 1:200 drawings, first SIA 380/1 thermal simulation, cost estimate to ±15%, consultation meetings with the municipality.

Observed duration: 4 to 8 weeks
32

Design development

Design development: 1:100 drawings, materials fixed, full cost plan following the Swiss CFC classification, estimate to ±10%.

Observed duration: 6 to 10 weeks
33

Building permit application

Permit procedure: public enquiry file, response to objections, building permit obtained.

Observed duration: 3 to 6 months
41

Tendering and award

Tendering: trade-by-trade specifications following the CAN standard, bid comparison, reasoned award recommendations.

Observed duration: 6 to 10 weeks
51

Detailed design

Detailed design: 1:50 technical drawings and 1:5 details, complete IFC model, services coordination with the engineers.

Observed duration: 8 to 14 weeks
52

Construction

Construction: site supervision, weekly site meetings, cost control by CFC heading, variation management.

Observed duration: 12 to 30 months
53

Handover and completion

Handover and completion: acceptance, snagging list, as-built documentation, warranties.

Observed duration: 2 to 4 months
61

Operation

Operation: monitoring of actual energy use over the first year, defects cleared before the warranty expires.

Observed duration: 2 years
C What we guarantee
01

Reply within 48 hours

Any written request gets an answer within two working days, even if the answer is that the full reply will take a week.

02

Site report within 24 hours

The site meeting report goes out the next morning and stands as the record. An in-house rule since 2013.

03

Estimates held to ±10%

From detailed design onwards, the gap between our estimate and the bids received stays under 10% on 9 projects out of 10.

Which stage are you at?

Even at idea stage, a one-hour conversation is usually enough to know whether the project stands up.

Discuss your project

A GoodWebsites demonstration

Do you like this website? It could be yours.

ATELIER 372 does not exist. The website does: films, portfolio, insights, careers, a complete English version and a business-tracking back office. Every line was written from scratch, with no off-the-shelf template. We build the same for your practice, with your projects.