SIA 380/1 et Minergie, 2025 threshold: what it changes in our drawings
Less concrete above ground, shorter spans, and trade-offs that move up into concept design.
The tightened carbon threshold has a very concrete effect: it moves decisions from technical design up into concept design.
The structural grid decides the carbon
Moving from an 8.10 m grid to 7.20 m switches a floor from concrete to hybrid. That trade-off is settled on the very first sketch.
What we now cost at concept stage
Two structural options, a simplified life-cycle assessment, a thirty-year whole-life cost. Three extra days of study that avoid three months of rework.