Process

Five phases, and a night before anything else

A hotel is drawn in order. Skipping a step is always paid for, and it is paid at opening — that is, at the worst possible moment.

  1. 01

    The night

    I sleep on site, alone, for one night. If the building does not exist, I sleep in the closest equivalent. Four notebook pages the next morning. This phase is not invoiced: it decides whether I take the project.

  2. 02

    Feasibility

    What the building can give: a realistic key count, service areas, regulatory constraints, budget order of magnitude. A short, honest document — including when the answer is no.

  3. 03

    Concept and preliminary design

    The architectural approach, floor plans, the room mock-up drawn full size in the studio, the first physical model. Everything is decided here.

  4. 04

    Detailed design and tender

    Construction drawings, details, material specifications, contractor tendering and bid analysis. The most thankless phase, and the most profitable one for the client.

  5. 05

    Site and opening

    Weekly site supervision, handover, snagging, and commissioning with the operating team. I am there on opening day, always.